|
<--Previous Up Next--> Bosley locks close for maintenance both before and after Christmas most years, and 2004 was no exception. We spent the window between the two parts of the stoppage period on the upper level of the Macclesfield Canal, and just before Christmas, it froze. |
| Text and images on this site © Bruce Napier 2003 - 2008 |